The p.v.c. pipe is then covered with 2″ of washed stone. Then a spunwoven plastic barrier is placed on top of the stone. The barrier helps keep the stone clean from the topsoil that is placed on next.
© 2018. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.
Powered by iWeb
Comments 0