The p.v.c. pipe is then covered with 2″ of washed stone. Then a spunwoven plastic barrier is placed on top of the stone. The barrier helps keep the stone clean from the topsoil that is placed on next.
Read moreThe p.v.c. pipe is then covered with 2″ of washed stone. Then a spunwoven plastic barrier is placed on top of the stone. The barrier helps keep the stone clean from the topsoil that is placed on next.
Read more© 2018. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.
Powered by iWeb