- All
- Construction
- Holding Tanks
- Mound System


This is the top half of a 6,000 gallon concrete holding tank.
Septic Systems ( holding-tanks )
6,000 gallon holding tank is complete
Septic Systems ( holding-tanks )
Mound System Installation
Septic Systems ( mound-system )
Crane truck is preparing to set the tank
Septic Systems ( holding-tanks )
Topsoil is stripped off and piled for later use on the site.
Grading ( construction )
Installation & Repairs
Since 1960, Klug Inc. has serviced Ozaukee, Washington, and Waukesha Counties.
(262) 377-3838 OR Contact Us